{"id":7102,"date":"2021-10-30T09:51:25","date_gmt":"2021-10-30T09:51:25","guid":{"rendered":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/?page_id=7102"},"modified":"2021-11-02T07:35:38","modified_gmt":"2021-11-02T07:35:38","slug":"ongoing-projects","status":"publish","type":"page","link":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/ongoing-projects\/","title":{"rendered":"Ongoing Projects"},"content":{"rendered":"

[vc_row][vc_column width=”2\/3″][vc_column_text]Major Projects (Ongoing)<\/strong><\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
Sr. No<\/strong><\/td>\nName of Work<\/strong><\/td>\nClient<\/strong><\/td>\n<\/tr>\n
1<\/strong><\/td>\n4-laning of existing 2 laning stretch from Moholat\u00a0 km 0.000 to Wakhri at km 44.700 (Pkg\u20131) on Mohol \u2013 Alandi section (design length 44.700 km) of NH- 965 in the state of Maharashtra<\/td>\nNHAI<\/td>\n<\/tr>\n
2<\/strong><\/td>\n4 laning of existing 2-laning stretch from Wakhri at Km 44.700 to Khudus at Km 77.800 (Pkg 2) on Mohol-Alandi section (design length 33.100 km) of NH-965 in the state of Maharashtra on EPC Mode<\/td>\nNHAI<\/td>\n<\/tr>\n
3<\/strong><\/td>\n4 laning of existing 2-laning stretch from Khudus at Km 77.800 to Dharmapuri at Km 115.35 (Pkg 3) on Mohol-Alandi section (design length 37.55 km) of NH-965 in the state of Maharashtra on EPC Mode<\/td>\nNHAI<\/td>\n<\/tr>\n
4<\/strong><\/td>\nFour Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka<\/td>\nNHAI<\/td>\n<\/tr>\n
5<\/strong><\/td>\nBalance Work of Construction of two\/four lane with paved shoulder from Km 422.00 to Km 523.600 (Chitradurga to Shimogga Section) of NH 13 in the State of Karnataka on EPC mode (Job No: NH-13- KNT-2020-21-915)<\/td>\nMinistry of Road Transport & Highway (MoRT&H)<\/td>\n<\/tr>\n
6<\/strong><\/td>\n\n

Upgradation\/Reconstruction To Two Lane With Paved Shoulders\/Four Lane Configuration – Barshi-Solapur \u2013 Akkalkot-Dudhani-aland<\/p>\n

To State Border Sh-204 Section – 3: BarshiTo Solapur From Km 1.400 To Km 63.300, Length = 61.900 Km In The State Of Maharashtra On EpcMode.<\/td>\n

Public Works Dept, Maharashtra (Maharashtra Road Improvement Project \u2013 ADB Assisted<\/em>)<\/td>\n<\/tr>\n
7<\/strong><\/td>\nUpgradation of Two lanes with Paved Shoulder from Pandharpur-Mangalwedha-Umadi Section of NH-516A, Package \u2013 II (Length \u2013 54.336 Km)<\/td>\nExecutive Engineer, NH, Solapur Division.<\/td>\n<\/tr>\n
8<\/strong><\/td>\nImprovements to NH-150A Jewaragi-Chamaraj Nagar section in Sindanoor City Km 171\/600 to 176\/600<\/td>\nExecutive Engineer, NH, Bijapur Division.<\/td>\n<\/tr>\n
9<\/strong><\/td>\nUpgradation of existing highway to 2 Lane\/ 4 Lane with paved shoulder configuration from Sangola to Jath (Km. 185\/339 to Km. 230\/123) section of NH-965G on EPC Mode<\/td>\nExecutive Engineer, NH, Solapur Division.<\/td>\n<\/tr>\n
10<\/strong><\/td>\nImprovement of Barshi-Solapur-Akkalkot-Dudhani-Aland to State Border, SH204, Km 1\/400 to 63\/300 (Barshi-Solapur Road), Dis. Solapur Length 61.90 Km<\/td>\nAsian Development Bank Funds, EAP, PWD, Maharashtra<\/td>\n<\/tr>\n
11<\/strong><\/td>\nPeriodical Renewal of NH-150E from Kalburgi connecting Chowdapur, Afzalpurupto Maharashtra state border in Karnataka state from Km. 09\/000 to 38\/375.<\/td>\nExecutive Engineer, NH, Kalburgi Division.<\/td>\n<\/tr>\n
12<\/strong><\/td>\nImprovements of various internal roads of Solapur City<\/td>\nSolapur Municipal Corpo, Solapur<\/td>\n<\/tr>\n
13<\/strong><\/td>\nImprovements to Lavangi-Karkal-Auj-Hurghot Road MDR \u2013 152, Km. 1\/0 to 15\/0, Tq. South Solapur<\/td>\nExecutive Engineer, PWD, Solapur Division<\/td>\n<\/tr>\n
14<\/strong><\/td>\nImprovements to Panhala-Waghbil-Vadgaon-Hatkanangale-Ichalkaranji Road (SH-192) Km 39\/000 to 59\/600<\/td>\nExecutive Engineer, Public Works Department, Kolhapur Division<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/3″][vc_images_carousel images=”7193,7192,7191,7188,7187,7186,7185,7183,7189,7182,7184,7190,7194″ img_size=”full” mode=”vertical” slides_per_view=”5″ autoplay=”yes” hide_pagination_control=”yes” wrap=”yes” css_animation=”fadeInUp”][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"

[vc_row][vc_column width=”2\/3″][vc_column_text]Major Projects (Ongoing) Sr. No Name of Work Client 1 4-laning of existing 2 laning stretch from Moholat\u00a0 km 0.000 to Wakhri at km 44.700 (Pkg\u20131) on Mohol \u2013 Alandi section (design length 44.700 km) of NH- 965 in the state of Maharashtra NHAI 2 4 laning of existing 2-laning stretch from Wakhri at<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/pages\/7102"}],"collection":[{"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/comments?post=7102"}],"version-history":[{"count":5,"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/pages\/7102\/revisions"}],"predecessor-version":[{"id":7212,"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/pages\/7102\/revisions\/7212"}],"wp:attachment":[{"href":"https:\/\/autadegroup.com\/dev-beta-21-ag-asdad\/wp-json\/wp\/v2\/media?parent=7102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}